Baxi 50 HE Plus Installation & Servicing Instructions Manual page 27

Wall mounted powered flue condensing boilers
Table of Contents

Advertisement

8.0 Installation
8.7
Fitting the Flue (Cont)
Inner Flue Support Bracket
6. Ensure the inner flue support bracket is positioned in
the flue (Fig. 28).
7. Engage the flue into the flue elbow using soap solution
to ease the engagement ensuring the flue is assembled as
shown (Fig. 29).
Fig. 28
8. Place the gasket over the flue exit on the boiler.
9. Slide the flue assembly through the hole in the wall.
Flue
10. Engage the elbow on to the flue connection on top
of the boiler. Secure with the four screws supplied in the
kit.
Flue Elbow
11. Make good between the wall and air duct outside the
building ensuring the 3° drop between the terminal and
elbow.
12. The flue trim should be fitted once the installation is
Apply Lubricant for ease of
complete and the flue secure (Fig. 30). Apply a suitable
assembly. Ensure Flue is fully
mastic to the inside of the trim and press against the wall
engaged into Flue Elbow.
finish, making sure the brickwork is dust free and dry.
13. If necessary fit a terminal guard (see Section 7.9).
Gasket
VERTICAL FLUEING
1. Only a flue approved with the Baxi 50, 80 and 100/2
HE Plus can be used.
2. For information on vertical flues consult the Baxi Flue
Guide Brochure or Notes for Guidance supplied with the
vertical flue pack.
Fig. 30
Flue Trim
Fig. 29
27
© Baxi Heating UK Ltd 2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

80 he plus100/2 he plus41 077 4141 077 4241 075 34

Table of Contents