Installation Environment Inspection - Toyotomi STG-909R32 User Manual

Wall mounted air conditioner inverter type
Hide thumbs Also See for STG-909R32:
Table of Contents

Advertisement

§
The air conditioner shall be installed in an accessible location to installation
and maintenance, without obstacles that may block air inlets or outlets of
indoor/outdoor units, and shall keep away from heat source infl ammable or
explosive conditions.
§
When installing or repairing the air conditioner and the connecting line
is not long enough, the entire connecting line shall be replaced with the
connecting line of the original specifi cation extension is not allowed.
§
Use new connection pipe, unless re-fl aring the pipe.
REQUIREMENTS FOR INSTALLATION POSITION
§
Avoid places of infl ammable or explosive gas leakage or where there are
strongly aggressive gases.
§
Avoid places subject to strong artifi cial electric/magnetic fi elds.
§
Avoid places subject to noise and resonance.
§
Avoid severe natural conditions (e.g. heavy lampblack, strong sandy wind,
direct sunshine or high temperature heat sources).
§
Avoid places within the reach of cnildren.
§
Shorten the connection between the indoor and outdoor units.
§
Select where it is easy to perform service and repair and where the
ventilation good.
§
The outdoor unit shall not be installed in any way that could occupy an
aisle, stairway, exit, fi re escape, catwalk or any other public area.
§
The outdoor unit shall be installed as far as possible from the doors and
windows of the neighbors as well as the green plants.

INSTALLATION ENVIRONMENT INSPECTION

§
Check nameplate of outdoor unit to make sure whether the refrigerant is
R32.
§
Check the fl oor space of the room. The space shall not be less than usable
2
space (5m
) in the specifi cation.The outdoor unit shall be installed at a
well-ventilated place.
§
Check the surrounding environment of installation site: R32 shall not be
installed in the enclosed reserved space of a building.
§
When using electric drill to make holes in the wall, check fi rst whether there
is pre-buried pipeline for water, electricity and gas. It is suggested to use
the reserved hole in the roof of the wall.
75
GB

Advertisement

Table of Contents
loading

Table of Contents