Four-Post Threaded Installation - Dell PowerSwitch S4128F-ON Installation Manual

Table of Contents

Advertisement

Figure 19. Two-post center-mount installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3. 
3. Repeat this procedure for the second rail.

Four-post threaded installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver.
Retain the latch castings for future rack requirements.
S4100–ON Series installation
27

Advertisement

Table of Contents
loading

Table of Contents