NETGEAR GSM4248PX Hardware Installation Manual page 50

Av line of fully managed switches
Table of Contents

Advertisement

2
Figure 23. Package contents
To check the package contents:
1. Place the container on a clean flat surface, and cut all straps securing the container.
2. Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4. Verify that the package contains the following items:
Number
Item
1
Switch of the model that you ordered.
Note: Rubber protection caps are installed in the SFP sockets. If you install an SFP transceiver
module, you must remove the cap from the SFP socket.
2
AC power cable or cables (varies by region).
Note: Model M4250-26G4F-PoE++ comes with two power cables.
Note: Model M4250-40G8XF-PoE++ comes with three power cables.
3
USB console cable.
4
Installation guide.
5
RJ-45 RS-232 console cable.
Installation
AV Line of Fully Managed Switches M4250 Series
1
3
5
7
6
8
50
4
9
Hardware Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

M4250 series

Table of Contents