Table of Contents

Advertisement

16
. BATTERY/CHARGING SYSTEM

BATTERY

Remove the seat and met-in box. ( 2-3)
Remove the battery cover screw and the
battery cover.
Remove the battery.
First disconnect the battery negative (-) cable
and then the positive (+) cable.
When disconnecting the battery positive
(+) cable, do not touch the frame with
tool; otherwise it will cause short circuit
and sparks to fire the fuel.
The installation sequence is the reverse of
removal.
First connect the positive (+) cable and then
negative (-) cable to avoid short circuit.
BATTERY VOLTAGE INSPECTION (OPEN
CIRCUIT VOLTAGE)
Disconnect the battery cables.
Measure the voltage between the battery
terminals.
Fully charged : 13.2V
Undercharged : 12.3V max.
Battery charging inspection must be
performed with a voltmeter.
CHARGING
Connect the charger positive (+) cable to the
battery positive (+) terminal.
Connect the charger negative (-) cable to the
battery negative (-) terminal.
Keep flames and sparks away
from a charging battery.
Turn power ON/OFF at the
charger, not at the battery terminals to
prevent sparks near the battery.
Charge the battery according to
the current specified on the battery.
During quick charging, the
battery temperature should not exceed
45℃ .
• Quick charging should only be done in
an emergency.
• Measure the voltage
the battery is charged.
Charging current : Standard : 1.2A
Quick
Charging time
: Standard : 5_
Quick
After charging: Open circuit voltage: 12.8V min.
www.PlanDeGraissage.org
60 minutes
after
:
5A
10 hours
:
60 minutes
Bet & Win 250
Battery Cover Screw
16-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh50ca

Table of Contents