Manual
MS-00809-0100-0470
13. Disconnect the Swagelok
14. Remove the module from the post.
6.2
Install a Maintainable Module
Prerequisites
Parts required
Rosemount 470XA
NOTICE
A gas GC using helium carrier gas has 9 Swagelok fittings.
A GC using hydrogen carrier gas has 13 Swagelok fittings.
Figure 6-2: Swagelok fittings
Replacing the Maintainable Module
fittings.
®
•
Analytical module
•
Swagelok
—
11 if using helium carrier gas
—
13 if using hydrogen carrier gas
June 2023
fittings
®
107