Lincoln Electric Fleet 400 Operator's Manual page 33

Hide thumbs Also See for Fleet 400:
Table of Contents

Advertisement

FLEET
400
4. LOCATE LEADS 5B & CA (SEE FIGURE 2). CUT LEAD 5B AT DISTANCE GIVEN
BELOW. STRIP BOTH ENDS OF CUT LEAD 13MM (.50 in.) CUT LEAD CA AT
DISTANCE GIVEN BELOW. STRIP BOTH ENDS OF CUT LEAD 13MM (.50 in)
FIGURE 2
NEUTRAL STUD
5. CONNECT LEAD "5B" FROM THE 230V EURO RECEPTACLES TO RCD (N – ON
TOP) AS SHOWN & TIGHTEN LEADS TO 2.4NM (21 in-lb) (SEE FIGURE 3).DO THE
SAME WITH THE OTHER END OF 5B ie. RCD N-ON BOTTOM TO NEUTRAL STUD.
6. CONNECT ONE END OF LEAD "CA" TO RCD (2) & TIGHTEN LEADS TO 2.4NM
(21 in-lb). CONNECT THE OTHER STRIPPED END of "CA" TO THE RCD (1) AND
TIGHTEN LEADS TO 2.4NM (21 in-lb).
7. COAT AREA WHERE LEADS CONNECT TO RCD WITH A SILICONE RUBBER
SEALANT.
8. MOUNT RCD WITH PROTECTIVE BOOT TO PANEL USING THE MOUNTING BRACKET
& SCREWS SET ASIDE IN STEP 3.
5D
5W
11A
C
CA
C
FROM STATOR
G-4
230V EURO RECEPTACLES
5E
5B
CA
5B
CA
TERMINAL CONNECTION
DIAGRAMS
REAR VIEW
CUT LEAD 5B
3" FROM SHRINK
WRAP CONNECTION
RCD OPENING
CUT LEAD "CA" APPROX.
16" FROM TERMINAL
CONNECTION TO "C" LEAD
SO THAT BOTH ENDS CAN
ENTER THE RCD.
RTV
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

12587

Table of Contents