Dimensional Data
Figure 10. Discharge opening for 40 to 60 ton
DEPTH OPENING
736
28.988
Figure 11. Discharge opening for 70 to 80 ton
Service Clearances
Table 9.
Service/code clearance requirements
Side
Front
Left Hand Starter
Left
Right Hand Starter
Left Hand Starter
Right
Right Hand Starter
Inlet
22
WIDTH OPENING
1580
62.205
AIRFLOW
DISCHARGE
OPENING WIDTH
2382
93.76
AIRFLOW
Distance - in. (mm)
42 (1066)
42 (1066)
9 (229)
9 (229)
42 (1066)
18 (457)
AIRFLOW
Purpose
Fans, Compressors, Condensers, Refrigeration access
NEC Code Requirement (Starter Panel)
NEC Code Requirement (Starter Panel)
Provides uniform air flow
DISCHARGE
OPENING DEPTH
736
28.99
PKG-SVX027D-EN