Table 1. Service Processor Checkpoints (continued)
Checkpoint
Description
9116
Load system data areas
(NACA/PACA)
9117
Start system IPL program
9119
Waiting for VPD collection to
complete
9184
Firmware image being loaded into
service processor's control storage
during firmware update.
91C4
Flash update pending, either a
firmware update or hypervisor
dump.
91FF
Control being handed to system
processor from service processor
9200
Scan interface BATs
9300
Logic BIST
9301
Scanned ABIST
9302
Dedicated ABIST
9303
Dedicated ABIST array fuse repair
calculation
9380
Built-in-self-test (BIST)
9400
Service processor is requesting
system flush
9410
Service processor is issuing request
to start instruction execution
9411
Service processor is issuing request
to stop instruction execution
9420
Service processor is issuing request
to start system clocks
Action/
Possible Failing FRU
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
1. Remove, then reapply power to
the system. If the service
processor enters recovery
mode, (indicated by A1FD 0000
in the display), attempt to
update the firmware again in
recovery mode. If the service
processor comes up to the OK
prompt, try again to update the
firmware using the service
processor menus.
2. Call service support.
Note: This checkpoint may be
displayed during the firmware
update process. The checkpoint
may be displayed for a long period
of time during the process. If
process does not complete, the
system may be hung.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
See note 2 on page 133.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
See note 1 on page 132.
Chapter 4. Checkpoints
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eserver 630 6e4

Table of Contents