SFP Modules
Installation
SFP
2
Tx
Rx
Removal
2
SFP
8
Cage Socket
1
Cage Socket
1
Lock
Rail Installation
3
Secure Rail Stoppers
Attach Rails
Rail Stopper Screws
(2x M4x8 on each side)
28x M4x5 Screws
(14 on each side)
Note: The recommended clearance is 1.5 inches above and below the
device.
Caution: To avoid personal injury or damage to the device, it is
recommended that two or more people mount the device on a rack.
2
1
Install Rackmount Brackets
9