7.2
Electrical wiring
L
N
T6A
TS
SB
TL
2
5
4
XP6
1
CONTROL BOX
N L
TB
K
Black
PH
White
Black
White
C
M V
Do not swap neutral and phase over, follow
the diagram shown carefully and carry out a
good earth connection.
The electrical wiring carried out by the
WARNING
installer must be in compliance with the rules
in force in the country.
The section of the conductors must be at
least 1mm
local standards and legislation).
Key to lay-out
C
Capacitor
E
Electrode
F
Flame sensor
K
Thermostat enabling start-up after preheating
MV
Motor
PH
Oil heater
RS
Remote reset
SB
Lock-out signal
T6A
Fuse
TB
Burner-earth
TL
Limit thermostat
TS
Safety thermostat
V
Oil valve
XP6
6 pole socket
2903310
Electrical system
535SE/LD
F
D7430
Blue
2
. (Unless requested otherwise by
Testing:
check the shut-down of the burner by opening the thermostats
and the lock-out by darkening the flame sensor.
7.2.1
Control box
DANGER
To remove the control box (Fig. 14) from the burner follow of the
istruction:
Loosen the screw 1), open the protection 2) and remove all
components.
Remove the coil 3).
Loosen the two screws 4).
Move a little the control box and remove the high voltage
leads.
E
4
V
3
4
Fig. 13
18
GB
This operation must be performed with the burner
turned off and mains power disconnected.
2
E9152
1
Fig. 14