CYBEX 12220-999-4 L Owner's Manual page 12

Strength systems
Table of Contents

Advertisement

Cable routing
1. Verify cable is routed through pulley brackets.
2. Verify cable is not twisted.
3. Place weight stack pin in each plate to verify proper installation.
4. Without selecting any resistance, lift top weight up and down (simulating normal operation).
5. Have an assistant verify that the cable is moving smoothly and is routed straight from the top
of pulley bracket to the top weight.
6. Turn the Increment Weight Adjusting Knob to select 0 lbs or 0 kg.
Install back shroud
1. Place shroud into position.
2. Starting at the bottom replace the two BHSCS to secure bottom support bracket to the
shroud.
3. Install but do not tighten remaining BHSCS securing shroud.
4. Tighten all BHSCS.
Cybex Owner's Manual
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vr3 cable column

Table of Contents