Download Print this page

Installation - Kohler ADAIR K-8699T Installation Instructions Manual

Advertisement

INSTALLATION

TO REMOVE EXISTING TOILET
Turn off the water supply. Flush the toilet, and use a sponge
to remove the remaining water from the tank and bowl.
Disconnect the supply shut-off valve (if present), and remove
the old tank and bowl.
Remove the old gasket from the floor
and the closet flange with a putty knife.
Remove the old T-bolts and discard
them.
NOTICE:
if the new toilet is not
installed immediately, temporarily stuff
a rag into the closet flange.
NOTICE: Do not use white cement or high lime content
cements to install this toilet. The expansion of cement due to
a rise in temperature may make the toilet crack or cause
damage. Kohler is not responsible for any damage caused by
installation with the use of cement.
TO INSTALL SUPPLY
SHUT-OFF VALVE
Install the supply shut-off valve so it is
200mm above the finished floor line,
and 160mm to the left of the closet
flange centerline.
The centerline of the supply shut-off
valve outlet should extend 67mm from
the finished wall. Install the supply
shut-off valve with the outlet vertical.
TO INSTALL BOWL
Position the template and align with
drain hole.
Mark down the position of foot and 5
holes.
Drill holes on ground with the drill of
10mm (3/8"), then insert anchor to
holes.
CAUTION: Please make sure there is
no water pipe or spool under the 5
holes to be drilled.
1285052-T01-A
Closet Flange
Supply Shut-Off Valve
160
200
Closet Flange
Centerline
305/400
Fig.#3
3
Drain Hole
Fig.#4
4
Fig.#5
5
-4-
(
)
Fig.#2
2
200mm
160
mm
10mm
3/8
10mm
T
67mm;
5

Advertisement

loading