Installation Overview - Napoleon Altitude AX36NTE Installation Manual

Hide thumbs Also See for Altitude AX36NTE:
Table of Contents

Advertisement

Available languages

Available languages

1.3

installation overview

12
Non-combustible
board
Recommended installation steps:
1. Determine all optional accessories and requirements for installation (see Owner's Manual for accessories).
2. Determine venting requirements before deciding the fi nal location of the appliance.
3. Determine fi nish fl oor thickness (see "fi nish fl oor consideration" section).
4. Install rough framing (refer to "rough framing" section).
5. Install nailing tabs and standoff assembly (refer to "nailing tab installation" and "standoff assembly" sections).
6. Place the appliance in its fi nal position.
7. Install appliance venting (refer to "venting installation" section).
8. Install all electrical wirings (refer to "electrical information" section).
9. Install gas lines (refer to "gas installation" section).
10. Test appliance.
11. Complete framing (refer to "fi nish framing - typical" or "fi nish framing - recess" sections).
12. Finishing (refer to "fi nishing" section).
note:
For Altitude™ X Heat Management installation steps, refer to the leafl et provided with the Altitude™ X Heat
Management kit. Start Altitude™ X Heat Management installation before step 6 (place the appliance in its fi nal
position).
11
5
6
general information
2
3
4
8
9
W415-1935 / D / 07.08.20
EN
5
7

Advertisement

Table of Contents
loading

Table of Contents