Installation Overview - Napoleon B36PTREA-1 Installation And Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

general information
EN
1.3

installation overview

3
8
6
1
2
4
9
7
5
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance.
2. Install rough framing (see "rough framing" section).
3. Place the appliance in its final position.
4. Install appliance venting (see "venting installation" section).
5. Install all electrical wirings (see "electrical information" section).
6. Install gas lines (see "gas installation" section).
7. Test appliance.
8. Complete framing (see "finish framing" section).
9. Complete finishing (see "finishing" section).
7
W415-3093 / B / 05.06.22

Advertisement

Table of Contents
loading

This manual is also suitable for:

B36ntrea-1Ascent 36-1

Table of Contents