Download Print this page

Site Requirements - Kohler LOVEE K-9289T Installation Instructions Manual

Freestanding bath with stainless foot and towel rack

Advertisement

SITE REQUIREMENTS

SITE REQUIREMENTS
A. Old Bath Removal (if necessary)
B. Preparation
Note: Adequate floor support must be provided. Refer to
roughing-in sheet packed with your bath for specific floor
loading requirements.
!
Make sure the floor offers adequate support for your
bath and verify that the subfloor is flat and level.
C. Plumbing Preparation
Position the plumbing according to rough-in dimensions.
Check the supplies for leaks.
INSTALL THE FREESTANDING BATH WITHOUT TOWEL RACK
1.
Install the feet.
!
Install the adjustable feet onto the feet.
!
Unpack the bath,
lift the bath
! Adjust the height of the bath to 560mm by adjusting
the adjustable feet bottom.
2. P lace to the predetermined position. Adjust the
adjustable feet to level the bath. Ensure that the
height of the bath is about 560mm.
3.
Install the plumbing
!
Install the bath drain. Please refer to the installation
instruction of Bath Drain K-15995T. Don't fix the
drain tail piece first.
!
Turn on the cold and hot supply, and then check all
the connections to see whether there is any leakage.
!
Run water, and then check the drain connection to
see whether there is any leakage.
1150366-T01-A
and fix the feet.
Bath
10mm Gasket
10
Feet
M10 Nut
M10
Adjustable Feet
A.
B.
!
C.
1.
!
!
10mm Spring Gasket
10
M10 Screw
M10
!
2.
3.
!
K-15995T
!
!
-3-
560
560

Advertisement

loading

This manual is also suitable for:

Lovee k-9271t