Download Print this page

Kohler LOVEE K-9289T Installation Instructions Manual page 5

Freestanding bath with stainless foot and towel rack

Advertisement

3.
Install the plumbing
!
Install the bath drain. Please refer to the installation
instruction of Bath Drain K-15995T. Don't fix the
drain tail piece first.
!
Turn on the cold and hot supply, and then check all
the connections to see whether there is any leakage.
!
Run water, and then check the drain connection to
see whether there is any leakage.
4.
Install the stainless steel pipe and the fixing plate
!
Install and fix the four stainless steel pipes and four
fixing plates according to the picture.
Square Tube
Step 2: Insert the square tube
with the fixing plate in it
into the foot.
2
5. Install the towel rack according to the picture.
6. Repeat step 4 to fix the towel rack and the fixing
plates.
1150366-T01-A
Fixing Plate
Step 1: Insert the fixing plate into
the square tube.
1
Insert into the hole of the square tube.
3.
!
K-15995T
!
!
4.
!
M5 Screw +
5mm Spring Gasket
M5
+5
5.
6.
4
-5-
Fixing Plate

Advertisement

loading

This manual is also suitable for:

Lovee k-9271t