Download Print this page

Kohler K-22106T-2 Installation Instructions Manual page 9

Vitreous china floor standing toilet

Advertisement

7. Fix faceplate
·
Put the faceplate onto the bottom board.
·
Pull the faceplate downwards.
·
Tighten the rod with L wrench.
Note:
When removing the faceplate, unscrew the screw 3mm
out and push the faceplate 3.5mm upwards to remove it.
8. Maintenance
Test run and check the valve after installation. Leakage at
inlet connector:
·
Refer to Fig.7 to check whether the seal is properly
installed, nut is tightened and whether the inlet pipe is at
proper vertical and horizontal level.
·
Leakage at outlet connector: Check whether the surface is
smooth, the seal is twisted and the nut is tightened.
·
Water cannot be stopped: Press the rod to check whether
it can be restored, there is wastes inside and valve
assembly is blocked.
1299535-T01-C
7.
·
·
·
L
Snap
Pull
Lock
Fig.9
9
8.
·
·
·
-5-
;
;
3.5mm
Faceplate Assembly
Button Assembly
Top Screw
Wrench
7
3mm

Advertisement

loading