Cornelius 322 Service/Installation Manual page 29

Ice cube machine
Hide thumbs Also See for 322:
Table of Contents

Advertisement

The system should be evacuated to approximately 200/250 microns. Then perform a 5 minute holding test. You
may expect a low grade loss of the vacuum as normal. However, a rapid rise to normal atmospheric pressure
would signal a system leak is present and must be located and repaired before recharging the product. A slower
pressure rise to approximately 1500 microns would signal moisture still present in the refrigeration system.
On a " WET"system, it would be beneficial to use heat lamps to raise the temperature of the compressor dome
and evaporator surface area during the evacuation.
To assure a properly recharged product, the refrigerant charge must be weighed into the product using an elec-
tronic charging scale or dial-a-charge. On air- and water-cooled products the charge should be introduced into
the high side service valve. On remote systems, the charge should be introduced into the product receiver.
OPEN
OPEN
VACUUM
PUMP
CLOSED
IMPORTANT: Service personnel are held responsible for ALL ASPECTS OF THE CLEAN AIR ACT OF
JULY, 1992.
REFRIGERANT DEFINITIONS (ASHRAE 3-1990)
RECOVERY
To remove refrigerant in any condition from a system and store it in an external container without necessarily
testing or processing it in any way.
RECYCLING
To clean refrigerant for reuse by oil separation and single or multiple passes through devices, such as replace-
able core filter-driers, which reduce moisture, acidity, and particulate matter. This term usually applies to proce-
dures implemented at the field job site or at a local service shop.
RECLAIM
To reprocess refrigerant to new product specifications by means which may include distillation. Will require
chemical analysis of the refrigerant to determine that appropriate product specifications are met. This term usu-
ally implies the use of processes or procedures available only at a reprocessing or manufacturing facility.
NOTES REGARDING RECLAIM:
" New product specifications"currently means ARI standard 700-88. Note that chemical analysis is required to
assure that this standard is met.
166240008
MANIFOLD SET
OPEN
OPEN
HIGH SIDE
SERVICE
VALVE
LOW SIDE
SERVICE
VALVE
CLOSED
CHARGING
CYLINDER
ELECTRONIC
SCALE
OPEN
CLOSED
VACUUM
PUMP
26
MANIFOLD SET
CLOSED
CLOSED
HIGH SIDE
SERVICE
VALVE
LOW SIDE
SERVICE
VALVE
OPEN
CHARGING
CYLINDER
OPEN
ELECTRONIC
SCALE
3/17/95

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

322 series

Table of Contents