For The Electrician - Scotsman SLC400 User Manual

Scotsman slc400 ice machine: user guide
Table of Contents

Advertisement

Installation
This unit must be on a separate 115 volt AC 60
cycle single phase power supply. The maximum
fuse size for this circuit is listed on the nameplate,
and per the nameplate use fuses, or HACR circuit
breakers.
To make the electrical connections:
1. Remove the right top panel.
2. Remove the junction box cover.
3. Make the electrical connections to the wires in
the junction box. A ground screw is provided in the
junction box.
Hand Disconnect Switch

For The Electrician

Follow All Local Codes - This Unit Must Be
Grounded. Usually a licensed electrician will be
required to connect the electrical service.
Junction Box
November 1994
Page 9
SLC400

Advertisement

Table of Contents
loading

Table of Contents