Benchmark Commissioning Checklist - Ariston CLAS ONE R 24 Installation And Servicing Instruction

Hide thumbs Also See for CLAS ONE R 24:
Table of Contents

Advertisement

GAS BOILER SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failuretoinstallandcommissionaccordingtothemanufacturer'sinstructionsandcompletethisBenchmarkCommissioningChecklistwillinvalidatethe
warranty.Thisdoesnotaffectthecustomer'sstatutoryrights.
Customername:
Address:
Boilermakeandmodel:
Boilerserialnumber:
Commissionedby(PRINTNAME):
Companyname:
Companyaddress:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
BuildingRegulationsNotificationNumber(ifapplicable):
CONTROLS(ticktheappropriateboxes)
Timeandtemperaturecontroltoheating
Timeandtemperaturecontroltohotwater
Heatingzonevalves
Hotwaterzonevalves
Thermostaticradiatorvalves
Automaticbypasstosystem
Boilerinterlock
ALL SYSTEMS
ThesystemhasbeenflushedandcleanedinaccordancewithBS7593andboilermanufacturer'sinstructions
Whatsystemcleanerwasused?
Whatinhibitorwasused?
Hasaprimarywatersystemfilterbeeninstalled?
CENTRAL HEATING MODE measureandrecord:
Gasrate
Burneroperatingpressure(ifapplicable)
Centralheatingflowtemperature
Centralheatingreturntemperature
COMBINATION BOILERS ONLY
Istheinstallationinahardwaterarea(above200ppm)?
Ifyes,andifrequiredbythemanufacturer,hasawaterscalereducerbeenfitted?
Whattypeofscalereducerhasbeenfitted?
DOMESTIC HOT WATER MODEMeasureandRecord:
Gasrate
Burneroperatingpressure(atmaximumrate)
Coldwaterinlettemperature
Hotwaterhasbeencheckedatalloutlets
Waterflowrate
CONDENSING BOILERS ONLY
Thecondensatedrainhasbeeninstalledinaccordancewiththemanufacturer'sinstructionsand/orBS5546/BS6798
ALL INSTALLATIONS
Recordthefollowing:
TheheatingandhotwatersystemcomplieswiththeappropriateBuildingRegulations
Theboilerandassociatedproductshavebeeninstalledandcommissionedinaccordancewiththemanufacturer'sinstructions
Theoperationoftheboilerandsystemcontrolshavebeendemonstratedtoandunderstoodbythecustomer
Themanufacturer'sliterature,includingBenchmarkChecklistandServiceRecord,hasbeenexplainedandleftwiththecustomer
CommissioningEngineer'sSignature
Customer'sSignature
(Toconfirmsatisfactorydemonstrationandreceiptofmanufacturer'sliterature)
* A llinstallationsinEnglandandWalesmustbenotifiedtoLocalAuthorityBuildingControl(LABC)eitherdirectlyorthrougha
CompetentPersonsScheme.ABuildingRegulationsComplianceCertificatewillthenbeissuedtothecustomer.
©HeatingandHotwaterIndustryCouncil(HHIC)
Roomthermostatandprogrammer/timer
Load/weathercompensation
Cylinderthermostatandprogrammer/timer
Atmax.rate:COppm AND
Atmin.rate:(wherepossible)COppm AND
Telephonenumber:
GasSaferegisternumber:
Telephonenumber:
Commissioningdate:
Fitted
Fitted
Fitted
Fitted
m³/hr
OR
ORGasinletpressure
mbar
m³/hr
OR
mbar ORGasinletpressureatmaximumrate
CO/CO ²
CO/CO ²
Programmableroomthermostat
Optimum start control
CombinationBoiler
Notrequired
Notrequired
Notrequired
Notrequired
Provided
Yes
Quantitylitres
Yes
No
Yes
No
Yes
No
Yes
Temperature
Yes
Ratio
Ratio
Yes
Yes
Yes
Yes
www.centralheating.co.uk
www.centralheating.co.uk
ft³/hr
mbar
°C
°C
ft³/hr
mbar
°C
°C
I/min

Advertisement

Table of Contents
loading

Table of Contents