4. Remove the four mounting screws and standoffs
5. Install the new standoffs supplied in the mounting kit in the vacant positions.
6. Place the Communications Module over the I/O Module and align connector J3 with P1 of
SITRANS F US Clamp-on Communications Module
Compact Hardware Installation Instructions, 2/2014, A5E32586525-AD
①
Flow Meter
②
I/O Module cover, cover screw,
standoff
③
Flow Meter Cover Latch
Figure 3-1
New Communications Module Installation
discard.
the I/O Module (figure 3-2).
F US Clamp-on Communications Module Installation
④
Power Connector location
⑤
I/O Module
⑥
I/O Module captive mounting screws
⑥
that secure the I/O Module
⑤
and
11