Mitsubishi Electric FR-E8TR Instruction Manual page 35

Rs-485 2 port terminal block
Table of Contents

Advertisement

NOTE
Crimp terminals commercially available (as of October 2020)
• Phoenix Contact Co., Ltd.
Terminal screw size
Wire gauge (mm
0.3
M3 (Terminals A, B, C)
0.5
0.75
M2 (Terminals other
0.3, 0.5
than the above)
• NICHIFU Co., Ltd.
Terminal screw size
Wire gauge (mm
M3 (Terminals A, B, C)
M2 (Terminals other
0.3 to 0.75
than the above)
2.
Loosen the terminal screws, and insert each wire into the terminal.
3.
Tighten the screw according to the specified tightening torque.
Undertightening may cause cable disconnection or malfunction. Overtightening may cause a short circuit or malfunction
due to damage to the screw or unit.
Terminal
Tightening torque (N·m)
A, B, C
0.5 to 0.6
Other than the above
0.22 to 0.25
NOTE
• Before wiring, remove the wiring cover of the inverter. (Refer to the FR-E800 Instruction Manual (Connection) for
instructions to remove or reinstall the cover.)
Ferrule part No.
2
)
With insulation sleeve
AI 0,34-6TQ
AI 0,5-6WH
AI 0,75-6GY
AI 0,5-6WH
2
Blade terminal part No.
)
BT 0.75-7
Small flathead screwdriver (tip thickness: 0.4 mm / tip width: 2.5 mm)
Without insulation sleeve
A 0,5-6
A 0,5-6
A 0,75-6
A 0,5-6
Insulation cap part No.
VC 0.75
Screwdriver
Crimping tool model No.
CRIMPFOX 6
Crimping tool model No.
NH 69
35
WIRING
3

Advertisement

Table of Contents
loading

Table of Contents