Enabling Hafm To Manage The Switch; Verify Communication Between Switch And Hafm Server; New Product Dialog Box - HP 316095-B21 - StorageWorks Edge Switch 2/24 Installation Manual

Fw 05.01.00 and sw 07.01.00 edge switch 2/24 installation guide
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Enabling HAFM to Manage the Switch

To manage a new switch, it must be identified to the HAFM application. To
identify the new switch:
1. Right-click in a blank area of the Product View page and select New or click
Figure 11: New Product dialog box
2. Type the IP address or DNS host name of the switch (determined by the
3. Select edge-24 from the Product Type field and click OK. A new switch icon
4. Repeat

Verify Communication Between Switch and HAFM Server

Communication must be verified between the switch and the HAFM server (High
Availability Fabric Manager and Product Manager applications). To verify
switch-to-server communication:
1. At the Windows 2000 desktop, click HAFM at the task bar (bottom of the
2. At the Product View page, inspect the shape and color of the symbol behind
Edge Switch 2/24 Installation Guide
Product on the menu bar and choose New. The New Product dialog box
displays
(Figure
11).
customer's network administrator).
displays at the Product View page.
step 1
through
desktop) to maximize the Product View page.
the Edge Switch 2/24 icon.
operational states.
Installing and Configuring the Edge Switch 2/24
step 3
for each new switch.
Table 3
explains the symbols and associated
47

Advertisement

Table of Contents
loading

Table of Contents