X-Slot Connections; Figure 4-17. Typical Battery Interface Connection - Separate Battery System - Eaton Power Xpert 9395 550/275 Installation And Operation Manual

Hide thumbs Also See for Power Xpert 9395 550/275:
Table of Contents

Advertisement

UPS System Installation
NOTE Battery Aux and DC Shunt Trip wiring should be a minimum of 18 AWG.
Figure 4-16. Typical Battery Interface Connection
48 Vdc Battery Shunt Trip +
48 Vdc Battery Shunt Trip –
NOTE Battery aux and DC shunt trip wiring should be a minimum of 18 AWG.
Figure 4-17. Typical Battery Interface Connection – Separate Battery System
4.7.3

X-Slot Connections

NOTE
NOTE
For installation and setup of an X-Slot card, contact an Eaton service representative (see page 1-9).
To install wiring to connections:
1.
If not already installed, install the LAN and telephone drops.
2.
Unfasten the front door latch and swing the door open (see Figure 4-2).
3.
Remove the UPS cabinet interface entry conduit landing plates to drill or punch holes (see Figure 4-4).
TM
4-22
Power Xpert
Battery Aux
Battery Aux Common
48 Vdc Battery Shunt Trip +
48 Vdc Battery Shunt Trip –
Battery Aux
5
Battery Aux Return
6
7
8
LAN and telephone drops for use with X-Slot cards must be provided by the
customer.
When installing external wiring to X-Slot cards, conduit must be installed to the UPS
cabinet. When installing internal wiring to X-Slot terminals, route the wiring through
the internal opening in the X-Slot communication bay.
9395 550/275 UPS (225–550 kVA) Installation and Operation Manual 164201716—Rev 8 www.eaton.com/powerquality
UPS
TB1
5
6
7
8
UPS
TB1
48 Vdc
Battery
Breaker or
Disconnect
ST
UPM 1
UPM 4
Battery
Battery
Breaker or
Breaker or
Disconnect
Disconnect
ST
ST

Advertisement

Table of Contents
loading

Table of Contents