PART NAMES
The following table indicates the part names of the NZ2GN-GFB.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(11)
No.
Name
(1)
PW LED
RUN LED
ERR. LED
(2)
D LINK LED (CC-Link IE TSN)
(3)
D LINK LED (CC-Link IE Field)
L ERR. LED
(4)
Function setting switch
(5)
CC-Link IE TSN IP address
setting switch
(6)
CC-Link IE Field Network
station number setting switch
(7)
Terminal block for module
power supply and FG
(8)
Reset switch
(9)
CC-Link IE TSN
communication connector (P1
and P2)
P1 LINK LED
P2 LINK LED
(8)
(9)
(10)
Description
Indicates the power status of the NZ2GN-GFB.
On: Power-on
Off: Power-off
Indicates the operation status of the NZ2GN-GFB.
On: Normal operation
Flashing: Unit test mode
Off: Major error
Indicates the error status of the NZ2GN-GFB.
On: Major/minor error occurring, or searching for error in all CC-Link IE Field Network stations
Flashing (500ms interval): Searching for data link faulty stations in CC-Link IE Field Network
Flashing (200ms interval): Major/moderate error occurring
Off: Normal operation
Indicates the CC-Link IE TSN data link status.
On: Cyclic transmission being performed
Off: Cyclic transmission stopped
Off: Disconnected
Indicates the CC-Link IE Field Network data link status.
On: Data link in progress (cyclic transmission being performed)
Flashing: Data link in progress (cyclic transmission stopped)
Off: Data link not performed (disconnected)
Indicates the CC-Link IE Field Network received data and link error status.
On: Abnormal data received or loopback being performed
Off: Normal data received and loopback not performed
This switch sets the functions of the NZ2GN-GFB. ( Page 29 Function setting switch setting)
Sets the IP address (fourth octet) of CC-Link IE TSN. ( Page 26 Settings for CC-Link IE TSN IP address setting
switch)
Sets the station number CC-Link IE Field Network. ( Page 28 Settings for CC-Link IE Field Network station
number setting switch)
A terminal block to connect the module power supply (24VDC) and FG.
Resets the NZ2GN-GFB.
Ports for CC-Link IE TSN connection. (RJ45 connector)
Connect an Ethernet cable. ( Page 39 Wiring of Ethernet Cable)
There is no restrictions on the connection order of P1 and P2.
Indicates the PORT1 link status of CC-Link IE TSN.
On: Link-up
Off: Link-down
Indicates the PORT2 link status of CC-Link IE TSN.
On: Link-up
Off: Link-down