Dispenser Preparation - Follett Horizon Elite HMF1810RJS Installation Instructions Manual

Ice machine models with ride technology
Table of Contents

Advertisement

Prepare the dispenser.
2.1
3.1

Dispenser preparation

4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
• Install gasket
onto bulkhead fitting
• Attach bulkhead fitting with flat up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
cap
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
and tighten bulkhead nut
with supplied screws
into bulkhead fitting and secure with coupling
remote condensing
Dispenser preparation
Hot Water
160 F (71 C)
12"
(304,8mm)
min.
DROP-IN • RIDE Technology
3

Advertisement

Table of Contents
loading

Table of Contents