Indoor Unit Installation Console Sizes 18−58 - International comfort products 40MBFQ Installation Instructions Manual

Floor console ductless system
Table of Contents

Advertisement

INDOOR UNIT PREPARATION
1. Open the Front Panel sliding the two stoppers towards the
middle of the indoor unit (see Fig. 7).
Fig. 7 - Open the Front Panel
2. Remove the front (see Fig. 8).
a. Disengage the string.
b. Remove the four screws.
Fig. 8 - Remove the screws
3. Remove the front cover (see Fig. 9).
a. Lift the front cover's bottom 30 degrees.
b. Lift the front cover's top.
Fig. 9 - Remove the front cover
INDOOR INSTALLATION CONSOLE
SIZES 18−58
1. The mounting hooks should be located horizontally and
level on the wall or vertical on the ceiling. All minimum
clearances should be maintained.
2. Remove the side boards and the grille (see Fig. 10).
Hanging arm
Hanging
screw bolt
Grille
Fig. 10 - Remove the side boards and the grille
3. Locate the hanging arm on the hanging screw bolt (Fig. 11).
Fig. 11 - Locate the hanging arm
4. Install the unit (see Figures 13 and 14).
Fig. 12 - Install the unit
D. Connecting point of
E. Connecting point of
Drain point
Downward declicity lower between(1-2)/100
Fig. 13 - Ceiling installation
8
Side board
refrigerant pipe
(D.gas side)
refrigerant pipe
(E. Liquid side)

Advertisement

Table of Contents
loading

Table of Contents