9.3 Connections to the indoor unit

9.3.1 To connect the electrical wiring to the indoor unit

EVLQ05+08CA + EHYHBH05A + EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
6 Install the switch box cover.
It is recommended to install all electrical wiring to the hydro box before installing
the boiler.
1 Wiring should enter the unit from the bottom.
2 Routing of the wiring inside the unit should be as follows:
INFORMATION
When installing field supply or option cables, foresee sufficient cable length. This will
make it possible to remove/reposition the switch box and gain access to other
components during service.
1 2 3
a
c
b
a
b
c
9
Electrical installation
|
Installer reference guide
117