Periodic Replacement Of Parts - Hitachi ZAXIS 70 Operator's Manual

Table of Contents

Advertisement

PERIODIC REPLACEMENT OF PARTS

To ensure safe operation, be sure to conduct periodic in-
spection of the machine. In addition, the parts listed below,
if defective, may pose serious safety/fire hazards. It is very
difficult to gauge the extent of deterioration, fatigue, or
weakening of the parts listed below simply by visual in-
spection alone. For this reason, replace these parts at the
intervals shown in the table below. However, if any of these
parts are found to be defective, replace before starting op-
eration, regardless of the interval.
Also, when replacing hoses, check the clamps for defor-
mation, cracks, or other deterioration, and replace as nec-
essary.
Be sure to perform periodic inspection of all hoses, as
shown below, and replace or retighten any defective parts
found, as necessary.
Consult your authorized dealer for correct replacement.
Engine
Hydraulic
System
NOTE: Be sure to replace seals, such as O-rings and
gaskets, when replacing hoses.
Periodic Replacement Parts
Fuel hose (Fuel tank to filter)
Fuel hose (Fuel tank to injection pump)
Heater hose (Heater to engine)
Pump suction hose
Base Machine
Pump delivery hose
Swing hose
Boom cylinder line hose
Front
Arm cylinder line hose
Attachment
Bucket cylinder line hose
Pilot hose
MAINTENANCE
7-9
Replacement
Intervals
Every 2 years
Every 2 years
Every 2 years
Every 2 years
Every 2 years
Every 2 years
Every 2 years
Every 2 years
Every 2 years
Every 2 years

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 70lcZaxis 80sbZaxis 80sblcZaxis 85us

Table of Contents