1.4 ASSEMBLY INSTRUCTIONS

1.
In an open area, remove the grass bag, hardware bag and
mower from the packaging.
2.
With help from an assistant, loosen the two (2) 3/8-16 elastic
flange nuts identified and raise the handle bar assembly. See
Figure 1-2.
2
Figure 1-2. Lift the Handle Bar Assembly
3.
While holding the handle bar assembly in place, Secure using
four (4) 3/8-16 x 3/4" carriage bolts and four (4) 3/8-16 elastic
flange nuts provided as shown Tighten mounting hardware and
pivot bolts See Figure 1-3.
1
Figure 1-3. Secure the Handle Bar Assembly
1
1
2
4
3
4.
The engine installed on this mower is shipped "dry" from
the factory. Add the recommended amount of oil to the engine
per the engine operator's manual supplied with this mower.
5.
Install the fabric grass collection bag over the bag frame
weldment. See Figure 1-4.
Figure 1-4. Install the Fabric Grass Collection Bag
6.
Secure the fabric grass collection bag to the frame weldment
using the eight (8) hooks located on the each side. See Figure
1-5.
8
7
6
Figure 1-5. Install the Grass Collection Bag
7.
Install the grass collection bag onto the back of the mower.
8.
Assembly is now complete on the mower.