To Remove The Spun Pipes - Daikin VRV IV+ RYYQ8U7Y1B Series Installer And User Manual

Hide thumbs Also See for VRV IV+ RYYQ8U7Y1B Series:
Table of Contents

Advertisement

17
|
Piping installation
To handle the service port
Tightening torques

17.2.11 To remove the spun pipes

Installer and user reference guide
90
Always use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
After handling the service port, make sure to tighten the service port cover
securely. For the tightening torque, refer to the table below.
Check for refrigerant leaks after tightening the service port cover.
Stop valve size
(mm)
Ø9.5
Ø12.7
Ø15.9
Ø19.1
Ø25.4
WARNING
Any gas or oil remaining inside the stop valve may blow off the spun piping.
If these instructions are NOT followed correctly it may result in property damage or
personal injury, which may be serious depending on the circumstances.
Use the following procedure to remove the spun piping:
1 Make sure that the stop valves are fully closed.
2 Connect the vacuuming/recovery unit through a manifold to the service port
of all stop valves.
p <
p >
A
B
a
d
N2
R410A
b
c
e
a Pressure reducing valve
b Nitrogen
c Weighing scales
d Refrigerant R410A tank (siphon system)
e Vacuum pump
f Liquid line stop valve
g Gas line stop valve
A Valve A
B Valve B
3 Recover gas and oil from the spun piping by using a recovery unit.
CAUTION
Do NOT vent gases into the atmosphere.
Tightening torque (N•m) (when opening or closing)
Valve body
Hexagonal wrench
5~7
8~10
14~16
19~21
f
g
Service port
4 mm
10.7~14.7
6 mm
8 mm
4P546228-1C – 2021.11
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents