Daikin VRV IV+ RYYQ8U7Y1B Series Installer And User Manual page 68

Hide thumbs Also See for VRV IV+ RYYQ8U7Y1B Series:
Table of Contents

Advertisement

16
|
Unit installation
Installer and user reference guide
68
NOTICE
Prepare a water drainage channel around the foundation to drain waste water
from around the unit. During heating operation and when the outdoor
temperatures are negative, the drained water from the outdoor unit will freeze
up. If the water drainage is not taken care of, the area around the unit might be
very slippery.
When installed in a corrosive environment, use a nut with plastic washer (a) to
protect the nut tightening part from rust.
a
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents