Daikin VRV IV+ RYYQ8U7Y1B Series Installer And User Manual page 101

Hide thumbs Also See for VRV IV+ RYYQ8U7Y1B Series:
Table of Contents

Advertisement

Charging refrigerant
<< Continuation of previous page
Step 5
• Connect valve A to the refrigerant charge port (d)
• Open all outdoor unit stop valves
Step 6
Proceed with automatic or manual charge
Step 6a
• Push 1x BS2: "888"
• Push BS2 for more than 5 seconds "t01" pressure equalisation
Depending on ambient conditions, the unit will decide to perform autocharge
operation in heating or cooling mode.
Continued on next page >>
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11
R>Q
Automatic charge
p <
p >
A
R410A
Step 6b
Activate field setting [2-20]=1
Unit will start manual refrigerant charging operation.
• Open valve A
• Charge remaining amount of refrigerant P (kg)
R=Q+P
• Close valve A
• Push BS3 to stop manual charging
• Charging is finished
• Fill in the amount on the additional refrigerant charge label
• Input the additional refrigerant amount via setting [2-14]
• Go to test run
17
Piping installation
|
d
Manual charge
Installer and user reference guide
101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents