Using The Stop Valve And Service Port - Daikin VRV IV+ RYYQ8U7Y1B Series Installer And User Manual

Hide thumbs Also See for VRV IV+ RYYQ8U7Y1B Series:
Table of Contents

Advertisement

17
|
Piping installation

17.2.10 Using the stop valve and service port

To handle the stop valve
To open the stop valve
Installer and user reference guide
88
Do NOT use flux when brazing copper-to-copper refrigerant piping. Use phosphor
copper brazing filler alloy (BCuP), which does NOT require flux.
Flux has an extremely harmful influence on refrigerant piping systems. For
instance, if chlorine based flux is used, it will cause pipe corrosion or, in
particular, if the flux contains fluorine, it will deteriorate the refrigerant oil.
ALWAYS protect the surrounding surfaces (e.g. insulation foam) from heat when
brazing.
Take the following guidelines into account:
Make sure to keep all stop valves open during operation.
The gas and liquid stop valves are factory closed.
The figures below show the name of each part required in handling the stop
valve.
c
a Service port and service port cover
b Stop valve
c Field piping connection
d Dust cap
d
a
b
e
c
a Service port
b Dust cap
c Hexagon hole
d Shaft
e Seal
Do NOT apply excessive force to the stop valve. Doing so may break the valve
body.
1 Remove the stop valve cover.
2 Insert a hexagon wrench into the stop valve and turn the stop valve
counterclockwise.
a
b
d
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents