Safety Tips For Installation - Toyotomi Toyostove Laser 730 Assembly, Installation And Operation Instructions

Laser clean heating system/vented heater
Hide thumbs Also See for Toyostove Laser 730:
Table of Contents

Advertisement

Laser 730&AT_Type A_US.qxd 15.3.18 16:36 ページ 25
Follow the safety tips below when planning the installation of your Laser 730/Laser 730AT.
1.
Intake and exhaust flue pipe openings must be fully exposed to outside air. Do not
vent into chimney, garage, basement under the floor, or into any enclosed area.
2.
Do not install flue pipe in close proximity to other objects or materials (See page
26).
3.
Before making a hole in your wall for the flue pipe, make sure the area is free of
electrical wires, gas pipes and other obstacles.
4.
Do not install flue pipe where it will be exposed to heavy snow collected leaves or
strong drafts.
Important:
In areas of hea-
vy snow falls,
ground surface
clearance must
be increased
according to
average snow
falls.
5.
Do not install the flue pipe
down from the heater.
6.
Total length of extension pipe between heater and flue pipe must be no greater
than 10 ft. and no more than 3 bends.
NOTE:
When using extension pipes always cover the exhaust pipe with the
insulating cloth cover.
7.
B-Vent shall not be used in the vent system.
For all prescribed heater installations, the flue pipe must always be installed in a
horizontal position.

SAFETY TIPS FOR INSTALLATION

SAFETY TIPS FOR INSTALLATION
Important:
In open area
Long
extension
with strong
kit
Must be
wind, a wind
higher
break may be
necessary.
Snow
Snow
Strong
wind
24"(Min.)
Wind
break
Gas pipe
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Toyostove laser 730at

Table of Contents