Brewer Setup - Fetco CBS-2231 Users Manual And Operator Instructions

Next generation brewing system
Table of Contents

Advertisement

Brewer Setup

NOTE-Assemble legs after unpacking the brewer and before connection to utilities
1) attach legs for 3 Liter/ 1 Gallon dispensing
1" legs -
Attach this length for
3 Liter air pot configuration
3 required for CBS-2232
4 required for CBS-2231
Legs are sent from factory inside brew basket. Attach legs before installing
2) Adjust dispenser locator for either 3 Liter / 1 Gallon dispensing
Layout of the brewer
Operation and service
Brew basket
Keypad for brewer operation
Hot Water Faucet
ON/OFF Switch
Air pot or Dispenser Locator
(Two for twin side)
Set Dispenser Locator
 Shown with 1 gallon dispenser
locator
-(User option)
Shown with 3 liter air pot Locator 
-(Factory installed)
12
2-1/2" legs -
Attach this length for
1 Gallon dispenser or 3 liter air pot.
Part number 1073.00016.00
3 required for CBS-2232
4 required for CBS-2231
For installing brewer
Power
Switch
USB
Connection
P215 REV000
February 2023
Electrical
Connection
Water
Supply
Connection

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-2232

Table of Contents