Thermostatic Cartridge Installation - Mira 1591.001 Installation And User Manual

Verve thermostatic bar valve and bath/shower mixer
Table of Contents

Advertisement

Thermostatic Cartridge Installation

1.
Install the stop ring into the nut.
2.
Install the stop assembly on the thermostatic cartridge, adjusting the
stop ring in the notch.
Note! Use only silicone based grease.
3.
Install the thermostatic cartridge in the body, adjusting the stop pin in
the notch.
4.
Loosely tighten the nut.
5.
Make sure that the thin black line aligns correctly with the slot.
6.
Fit the temperature hub. Make sure that the slot on the hub aligns
correctly with the thin black line and the slot on the thermostatic
cartridge.
7.
Install the temperature knob. Make sure the stop feature inside the
knob is towards the top.
8.
Turn on the water supply and check for leaks.
Stop Feature
Align Markers
22
P4842110
1054961-W2-B

Advertisement

Table of Contents
loading

This manual is also suitable for:

1591.002

Table of Contents