Clearance Data -U Tube; Figure 11: U-Tube, Horizontal Mount; Figure 12: U-Tube, One Side Reflector; Figure 13: U-Tube, Two Side Reflectors - Roberts Gorden Blackheat BH20UT Installation, Operation & Service Manual

Vacuum assisted linear, double linear, u-tube, and multi-burner gas fired heating systems
Table of Contents

Advertisement

®
B
I
LACKHEAT
NSTALLATION

3.3 Clearance Data -U Tube

NOTE: 1. All dimensions are from the surfaces of all tubes, couplings, tees, elbows and crosses.

FIGURE 11: U-TUBE, HORIZONTAL MOUNT

A
B
D
C

FIGURE 12: U-TUBE, ONE SIDE REFLECTOR

A
D
B
C

FIGURE 13: U-TUBE, TWO SIDE REFLECTORS

A
D
B
C
FIGURE 14: U-TUBE, FULL 45° MOUNT
A
B
D
C
8 of 74
O
S
M
PERATION AND
ERVICE
ANUAL
2. Clearances B, C and D can be reduced by 50% after 7500 mm of tubing downstream
from the burner.
3. All measurements are in millimeters.
4. Add 60 mm clearance to uncovered U-tube.
A
150
150
B
890
970
C
1580
1730
D
760
940
A
150
150
B
230
230
C
1580
1760
D
1200
1380
A
150
150
B
590
640
C
1660
1810
D
590
640
A
200
200
B
200
200
C
1500
1650
D
1070
1170
150
150
150
970
1020
1170
1730
1910
1980
940
1000
1090
150
150
150
230
230
230
1760
1930
2090
1380
1500
1660
150
150
150
640
690
820
1810
1960
2110
640
690
820
200
200
200
200
200
200
1650
1860
1960
1170
1320
1550
150
200
200
1220
1270
1380
2050
2110
2210
1150
1200
1300
150
200
200
230
230
230
2130
2160
2240
1710
1760
1860
150
200
200
860
890
1020
2160
2210
2320
860
890
1020
200
200
200
200
200
200
2040
2110
2160
1620
1680
1780

Advertisement

Table of Contents
loading

Table of Contents