ADT -CHG-120 Instruction Manual page 18

Table of Contents

Advertisement

ADT-CHG-120 Instruction 05/01/98 PN 50938:A
You can connect a VM-1 across a charger output circuit. For example,
,QVWDOOLQJ D 90
to install a VM-1 to measure voltage from charger output circuit 1, follow these steps:
1.
Connect the positive lead to TB2 Out 1 (+). See Figure 13.
2.
Connect the negative lead to TB2 Out 1 (–). SeeFigure 13.
3.
Mount the VM-1 into a mounting slot on the front of the BB-55 battery box.
,QVWDOOLQJ DQ 030
To install an MPM-3, follow these steps:
1.
Connect the AM-1 (Figure 13).
2.
Connect the VM-1 (Figure 13).
3.
Mount the MPM-3 onto a power supply connected to your system, such as an
MPS-400 or MPS-24A (Figure 15).
3RZHU VXSSO\ ERDUG
036 RU
036$
030
0RXQWLQJ VFUHZV
Figure 15 Mounting an MPM-3
15

Advertisement

Table of Contents
loading

Table of Contents