Checking Of Operation And Creation Of Tuning Parameter Project - Omron CK3W-AX2323 Series Startup Manual

Directpwm interface
Hide thumbs Also See for CK3W-AX2323 Series:
Table of Contents

Advertisement

8
If Following Error has a positive corre-
lation to the velocity, make Kvff larger.
If it has a reverse correlation, make
Kvff smaller.
9
Click the Parabolic Velocity Move but-
ton again.
Repeat this until the correlation of
Following Error to the velocity dis-
appears.
10
In the same way, if Following Error
has a correlation to Acceleration,
Position, etc., increase or decrease the
Kaff and Kfff values.
3-6-6

Checking of Operation and Creation of Tuning Parameter Project

Follow the procedure below to check operations and create a tuned parameter project.
CK3M/CK5M Series Startup Guide DirectPWM Interface (O047)
3 DirectPWM Interface Connection Procedure
3
3-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ck3w-ax1313 seriesCk m-cpu1 1 seriesCk3w-ax series

Table of Contents