HP ProLiant DL20 Gen10 User Manual page 127

Table of Contents

Advertisement

9. Cable the controller .
10. Install the riser cage.
11. Install the access panel .
12. Install the server into the rack .
13. Connect all peripheral cables to the server.
14. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
15. Configure the controller .
16. If removed, install the front bezel .
The installation is complete.
Installing a modular Smart Array controller option (type-a, AROC)
127

Advertisement

Table of Contents
loading

Table of Contents