Installation (Water Connections) continued-
WARNING
For protection against excessive temperatures and pressure, install
temperature and pressure protective equipment required by local
codes, but not less than a combination temperature and pressure
relief valve certified by a nationally recognized testing laboratory that
maintains periodic inspection of production of listed equipment or
materials as meeting the requirements of the Standard for Relief
Valves and Automatic Gas Shutoff Devices for Hot Water Supply
Systems, ANSI Z21.22 or the Standard CAN1-4.4. Temperature and
Pressure and the Standard CAN1-4.4, Temperature, Pressure,
Temperature and Pressure Relief Valves and Vacuum Relief Valves.
The combination temperature and pressure relief valve must be
marked with a maximum set pressure not to exceed the maximum
working pressure of the water heater. The combination temperature
and pressure relief valve must also have an hourly rated temperature
steam BTU discharge capacity not less than the hourly rating of the
water heater.
Install the combination temperature and pressure relief valve into the
opening provided and marked for this purpose on the water heater.
Note: Some models may already be equipped or supplied with a
combination temperature and pressure relief valve. Verify that the
combination temperature and pressure relief valve complies with local
codes. If the combination temperature and pressure relief valve does
not comply with local codes, replace it with one that does. Follow the
installation instructions above on this page.
Install a discharge line so that water discharged from the combination
temperature and pressure relief valve will exit within six (6) inches
(15.2 cm) above, or any distance below the structural floor and cannot
contact any live electrical part. The discharge line is to be installed to
allow for complete drainage of both the combination temperature and
pressure relief valve and the discharge line. The discharge opening
must not be subjected to blockage or freezing. DO NOT thread, plug
or cap the discharge line. It is recommended that a minimum
clearance of four (4) inches (10.2 cm) be provided on the side of the
water heater for servicing and maintenance of the combination
temperature and pressure relief valve.
Do not place a valve between the combination temperature and
pressure relief valve and the tank.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lg250h653nLg255h783nLg275h763nLg2100h803nUlg2100h803n

Table of Contents