North Star M157595BE Owner's Manual page 14

Table of Contents

Advertisement

9.) Crank jack down farther (so A-frame goes up) to
take weight off front shipping posts.
10.) Remove front shipping posts and slide front
pallet out of the way.
11.) Crank jack up as far as it will go (so A-frame
goes down and weight is applied to wheels)
12.) Disconnect rear shipping posts from frame
(remove only the bolts at the top of the rear
shipping posts)
13.) Roll trailer forward until it is free
of the rear shipping posts
14.) Attach coupler to a-frame with two
1/2x4" bolts and Class G lock nuts.
Tighten each bolt to 90ft.-lbs. Use a
torque wrench.
15.) Attach safety cables to the a-frame with
1/2" x 5" bolt and Class G lock nut.
Place a flat washer next to the head of
the bolt, slide the bolt through the cable
and the A-frame. Then slide the other
cable onto the bolt, followed by another
washer then the lock nut. Tighten to
37ft.-lbs.
Attach truck chest to A-frame with four
16.)
5/16 x 1-1/4" bolts, lock nuts, and
washers. Align two tool box plates with
holes in bottom of tool box. Place a flat
washer onto the bolt, then insert bolts
down though holes in plate, truck chest
and A-frame. Place washers under wall
of A-frame and fasten with lock nuts.
Tighten each bolt to 20ft.-lbs.
1/2" x 5"
Bolt
Flat Washer
Safety Cable
Assembly and Initial Set-Up
Step 2. Trailer Assembly (continued)
Rear Shipping Posts
(one on each corner)
Tow Bar
Tube
Safety Cable
Flat Washer
Class G Lock
Nut
14
Front Shipping
Posts
Safety Cables
5/16" x1-1/4"
bolt
Toolbox Plate
Toolbox
A-frame
Truck chest
Coupler
Flat Washer
Flat Washer
Lock Nut

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

157595

Table of Contents