3 Installation
The chapter contains instructions for
(1) Mechanical installation
(2) Electrical Installation
(3) Communication setup
3.1 Unboxing & Review
Unpacking the M100_210, please follow the order of Figure 3-1.
It could be transported by 2 people (Figure 3-2) .
- Need more than two people to stand up.
- It is recommended to install the grounded brackets first at this step for ground
mount installation. For detailed installation methods, please see section 3.2.
Figure 3-1: The step to unpacking the inverter
CAUTION !
17