2 Installation And Wiring; Instruction Before Installation; Unpacking - Delta H2.5 Operation And Installation Manual

Grid-tie transformerless solar inverter
Table of Contents

Advertisement

2 Installation and Wiring

2.1 Instruction before Installation

Due to the variety of users and installation environments, you must read this
manual thoroughly before installation. Installation of the unit and start-up
procedures must be carried out by an accredited technician.

2.2 Unpacking

Unpacking process is shown as Figure 2-1.
Upon receiving your brand new RPI inverter, you will be required to remove it's
protective packaging. This packaging consists of various materials that will need
to be disposed of according to the specific recycling marking printed on them.
Figure 2-1 : Unpacking process
7
Installation and Wiring

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents