Base ground construction
Draining pit
Over 200 (8)
<When installing on the ground>
Outdoor unit installation
Over
200 (8)
Outdoor unit base mount and anchor
bolt position
A
B
C
DB68-11976A-00_IM_DVM S2 Outdoor_SA_EN_.indd 13
DB68-11976A-00_IM_DVM S2 Outdoor_SA_EN_.indd 13
Unit : mm (inch)
Bottom surface of the base ground
must be horizontally leveled
Over 200 (8)
<When installing on the roof>
Unit : mm (inch)
Base
ground
H beam or anti-
vibration frame
Unit : mm (inch)
Outdoor unit - Anti-vibration
frame [4/8-Φ12(0.47)]
Anti-vibration - Base ground
[4-Φ18(0.71)]
DVM S2
Classification
Small type
A
930 (36.6)
B
790 (31.1)
C
-
※ Refer to the blueprints in technical data book to make a holes
for connecting the anti-vibration pad.
Examples of draining work
• Construct the drainage ditch with reinforced concretes and
make sure that water-proofing work is done.
• For smooth draining of defrost water, make sure to apply 1/50
slope.
• Construct a drainage around the outdoor unit to prevent
the defrost water (from the outdoor unit) from stagnating,
overflowing or freezing near the installation space.
• When the outdoor unit is installed on the roof, check the
strength and waterproof status of the roof.
X
120 (4.73)
B
A
<Drainage work for single installation>
<X-X' SECTION>
B
240
240
(9.45)
(9.45)
<Drainage work for module installation>
DVM S2
Classification
Small type
A
1030 (40.6)
B
790 (31.1)
Unit : mm (inch)
DVM S2
DVM S2
Large type
X-Large type
1295 (51)
1860 (73.2)
1155 (45.5)
1720 (67.7)
-
150 (5.9)
Unit : mm (inch)
X'
Direction of
the drainage
(Slope 1/50)
150 (5.91) 100 (3.94)
Direction
of the
B
drainage
(Slope 1/50)
Unit : mm (inch)
DVM S2
DVM S2
Large type
X-Large type
1395 (54.9)
1960 (77.2)
1155 (45.5)
1720 (67.7)