Chapter 1 General requirements

Section 1.1 Objectives and overview

This document is intended as a guide and informational resource for planning and properly
preparing a location for the installation of the Optima XR200amx/XR220amx system.
To avoid unnecessary expenses and delays, be sure to review all the information in this manual to
determine whether the site is ready for the installation to begin. This is an important process that
helps verify site readiness.

1.1.1 Pre-installation tasks

Pre-installation is a cooperative effort between the customer/purchaser and GE Healthcare. The
diagram below shows the pre-installation process.
Chapter 2 Special
construction requirements
Chapter 3 Environmental
(HVAC) requirements
Chapter 4 Electrical
requirements
Chapter 5 Communication
requirements
Chapter 6 Network /
workflow information
3
EVISION
Site data
collected from
field
Site planning
Pre-installation
Chapter 1 General requirements
Radiation
consultant
site work
O
XR200
/XR220
PTIMA
AMX
P
-I
RE
NSTALLATION
No
Planning and
site work
complete?
Yes
Delivery and
installation
AMX
M
ANUAL
Page 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima xr220amx

Table of Contents