Chapter 1. General Requirements

1.1 Objectives & Overview

1.1.1 Object and Scope of this manual

This document is intended as a guide and information resource to properly plan and prepare a site for
the installation of an Innova system (Innova IGS 620, Innova IGS 630).
In addition, this document provides references to the pre–installation documents of the various product
included with an Innova System.
These documents are intended to assist the Installation Specialist and the Site Planner in properly
preparing a site for the installation of this system.
It provides pre–installation data, such as site preparation prior to the delivery of the Innova System,
environmental and electrical requirements and some additional planning aids.
WARNING
MAKE SURE THE ROOM PREPARATION COMPLIES WITH LOCAL REGULATIONS AS
THE PIM IS NOT INTENDED TO REFLECT ALL OF THEM

1.1.2 Pre-Installation Process

Complete the checklists in ROOM LAYOUTS, ELECTRICAL CONNECTIONS, and ADDITIONAL PLANNING AIDS
of this manual. They represent an important part of the pre–installation process. The checklists
summarize the required preparations and allow to verify the proper completion of the pre–installation
procedures.
You will find hereafter a chart of the information flow in the pre-installation process.