Bryant 935SB Installation, Operating And Maintenance Instruction page 14

Single-stage, upflow/horizontal ultra low nox, 35-in. tall, condensing gas furnace
Table of Contents

Advertisement

935SB: Installation, Start-up, Operating and Service Maintenance Instructions
Fig. 14 – Upflow Example of Trap Adapter Installation
Fig. 15 – Upflow Condensate Drain
Fig. 16 – Upflow - Offset of Condensate Drain
!
Upflow installations utilizing the right side air return opening should
follow the Upflow Specific Steps - Offset Installation to ensure the full
opening is available for return ductwork.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
NOTICE
A200076
Fig. 17 – Upflow Right Side Return Configuration - Trap
Fig. 18 – Upflow Right Side Return Configuration - Required
A200064
Fig. 19 – Example of Tube Connection
Upflow Specific Steps – Standard Installation
1. Install trap adapter to the collector box using provided machine
screw (see
Fig.
A200065
2. Screw the adapter plate to the trap adapter using provided machine
screw (see
Fig.
3. Screw the adapter plate to the side of casing using six (6) of the
provided sheet metal screws (see
recommended to better align the plate with the knockout opening.
4. Screw the trap to the adapter plate using provided machine screw
(see
Fig.
15).
5. Remove factory-installed collector box cap. Run tube from port on
upper left of the collector box to the relief port on the trap adapter
14
Interference
Upflow Offset Installation
14).
15).
Fig.
15). Drilling pilot holes is
A200119
A200120
A200077

Advertisement

Table of Contents
loading

Table of Contents